📋 Article outline
CD Restop Suối Tiên — The First Point in a Green Social Infrastructure Rest Stop Network
Continuing our mission to serve the community and realize a vision of prosperous, sustainable lives for workers, CD Restop Social Infrastructure Investment JSC — a key member of the Linh Nam Ecosystem — announces the groundbreaking of the CD Restop Suối Tiên Rest Stop at the eastern gateway of Ho Chi Minh City, currently under development.
Strategic Location — HCMC Eastern Gateway
CD Restop Suối Tiên is located on Hanoi Highway, Tan Phu Ward, Ho Chi Minh City — a critical junction between HCMC and the southeastern provinces. Set on a gateway corridor carrying heavy daily traffic, this location is the natural connection point for long-haul drivers, travelers, and the EV transition community.
5-Space Integrated Model
Unlike traditional rest stops, CD Restop Suối Tiên operates on a "Multi-amenity destination" model with 5 functional spaces designed to a unified 5-star standard:
- ⚡ EV DC Fast Charging Station: DC fast chargers at 160–240 kW, 4 multi-standard stations (CCS2 · GB/T · CHAdeMO · Type2) for EVs, e-scooters and commercial vehicles. A solar canopy reduces reliance on the grid.
- ☕ F&B & GOMO Convenience Store: Specialty coffee bar, pastries, beverages, GOMO Combo Mart with regional specialties and 3 stabilized-price combos.
- 🛋️ Premium Lounge: Premium sofas, workstations, high-speed Wi-Fi, entertainment TV — for EV-charging customers and long-haul drivers.
- 🛏️ Rest Pods: Private sleep pods with curtains, reading lights, power outlets — safe rest solution for long-haul drivers, 2–4h hourly rentals.
- 🚻 5-Star Restrooms: Hotel-standard, premium wood-and-stone design, accessible stalls, automatic hand dryers and sanitizer dispensers.
Strategic Implementation Partners
The project is made possible through strategic partnerships with reputable partners:
- EVIA Global Green: Genuine 240 kW DC Fast charger technology, OCPP 2.0.1 CSMS system
- Cienco 68: A transport infrastructure company with many years of experience building large-scale projects
- 365 Group: Green transition solutions and driver network connection
- Global Care: Comprehensive insurance for charging stations, chargers and project assets
Expected Impact
Once in operation, CD Restop Suối Tiên will:
- Serve long-haul drivers moving to EVs, delivery riders and passengers on the eastern gateway route
- Cut emissions through on-site solar power and EV charging
- Create local jobs for workers in the area
- Become a model rest stop for the four-tier design standard
Its place in the network
CD Restop Suối Tiên is one of the first projects in the social-welfare rest stop network, which targets 500 rest stops and 14,000 satellite charging points across 34 provinces and cities. Investors and partners may contact our Investor Relations team; participation terms for each project are provided after a non-disclosure agreement.
"CD Restop Suối Tiên is not just a rest stop — it is a manifesto for a new generation of infrastructure where transportation, commerce and community welfare converge to comprehensively serve the Vietnamese people."
— Nguyễn Ngọc Hải, General Director, CD Restop
Follow project progress & partnership opportunities: Rest Stop Network · Investor Relations · Hotline: 0981 107 900 · Email: invest@cdrestop.com